Book a Demo

Concentio Cortex®

AI-Driven Intelligence for IoT and Visual Data.

Request a Demo

What is Concentio Cortex?

Concentio Cortex is Scry AI's next-gen AI engine, purpose-built to transform IoT and visual data into real-time, high-impact intelligence.

  • Seamlessly handles data from sensor-rich IoT systems and video/imagery sources.
  • Transforms raw input into real-time intelligence using 25+ proprietary AI algorithms.
  • Powers anomaly detection, forecasting, predictive maintenance & data quality enhancement.
  • Improves data quality through built-in cleansing, normalization, and enrichment pipelines
  • Integrates with any IoT/data platform or ingests directly via standard & custom connectors.
  • Delivers outcomes via well-documented APIs for easy consumption.

How it works?

From Raw Data to Intelligent Action

Step 1

Data Ingestion

The platform is designed to ingest, normalize, and transform data from a wide variety of systems ensuring rapid onboarding and minimal IT friction.

Step 2

Data Quality Improvement

The platform is designed to ingest, normalize, and transform data from a wide variety of systems ensuring rapid onboarding and minimal IT friction.

Step 3

Advanced AI Use-Case Enablement

The platform comes with a library of 25+ proprietary AI algorithms, built from diverse real-world scenarios. These ready algorithms serve as a foundation and can be rapidly trained and customized on your data to unlock specialized use cases faster.

Ready Use-Cases

Domain-Adapted AI for Real-World Impact

Smart Leakage Detection

Concentio Cortex detects leaks in water distribution networks, oil and gas or industrial plants, and households.

  • 85% faster than conventional smart devices
  • Intelligent Classification: Platform intelligently classifies leaks into various categories such as "Pipe Burst", and "Running Tap" and provides clear insights for targeted interventions and efficient maintenance
  • Dynamic Severity Assessment: Platform evaluates the severity of leaks, assigning appropriate alert levels based on leakage magnitude and helps operators prioritize and address the most critical issues promptly

Intelligent Power Line Monitoring using Drones and CCTV Cameras

  • Identifies conductor sagging, insulator damage, vegetation encroachment, and overheating using advanced computer vision
  • Detects faults, vegetation encroachment, overheating
  • Interprets live visual feeds using AI vision models
  • Triggers maintenance workflows based on severity and risk scoring

Scene Detection & Construction Progress Reporting

Concentio Cortex detects leaks in water distribution networks, oil and gas or industrial plants, and households.

  • Uses drone or CCTV footage to track site activity
  • Identifies equipment, workers, safety gear, and material usage
  • Matches observed work with planned stages to auto-generate progress reports
  • Flags delays, idle machinery, or incomplete tasks in real time
  • Automatically archives visual data with timestamps for future audits or claims
  • Presents insights via visual dashboards with drill-down capability

Why Choose Concentio Cortex?

Concentio Cortex is Scry AI's next-gen AI engine, purpose-built to transform
IoT and visual data into real-time, high-impact intelligence.

Purpose-Built for IoT & Visual Data
Purpose-Built for IoT & Visual Data

Unlike generic AI platforms, Concentio Cortex is engineered specifically to handle time-series sensor data, video streams, and hybrid inputs all in one platform.

25+ Proprietary AI Models
25+ Proprietary AI Models

Accelerate deployment with a rich library of prebuilt models for anomaly detection, forecasting, visual recognition, predictive maintenance, and more customizable to your domain.

Built-in Data Quality Engine
Built-in Data Quality Engine

Bad data = bad decisions. Cortex automatically cleanses, validates, and enriches incoming data, improving reliability and unlocking better AI outcomes.

Edge-to-Cloud Flexibility
Edge-to-Cloud Flexibility

Deploy Cortex where it makes sense on the edge for low-latency use cases, or in the cloud for centralized intelligence. Hybrid architecture supported out of the box.

API-First & Integration-Ready
API-First & Integration-Ready

Easily connect to existing IoT platforms, SCADA systems, video management tools, or data lakes using standard and custom connectors. All results are accessible via well-documented APIs.

Enterprise-Grade & Secure
Enterprise-Grade & Secure

Supports role-based access control, encrypted data flow, and audit logging. Scales horizontally across thousands of devices and video streams.

Clients

We are trusted by enterprises globally.

Deployment, Compliance & Trust

Collatio® DocuTwin

Deploy On-Prem or Private Cloud

Keep all data within your firewall

Collatio® DocuTwin

Compliance-Ready

SOC 2, ISO 27001 compliant

Collatio® DocuTwin

Traceable, Explainable AI

Every response is linked to its original data source, ensuring auditability and compliance

Frequently asked questions

Yes. Cortex allows enterprises to integrate their own models alongside or in place of the built-in ones. Models can be imported via standard ML formats and triggered as part of data pipelines.
Cortex is optimized for:
  • Time-series IoT and SCADA data
  • Video streams (e.g., drone, CCTV, thermal)
  • Still images (e.g., inspections, satellite shots)
  • Hybrid datasets involving metadata or structured inputs
Cortex includes a built-in data quality engine that automatically validates, cleans, deduplicates, and enriches incoming data before it's processed by AI models - ensuring insights are built on trustworthy data.
Cortex supports flexible deployment models:
  • Edge (on-device or edge gateways)
  • Cloud (public or private)
  • On-premise or hybrid environments
Depending on complexity, pilot setups can be up and running in 4-6 weeks using existing connectors and prebuilt models. Full-scale deployments follow agile rollouts customized to your environment.

Ready to unlock intelligence from your IoT and visual data?

Book demo